βœ“ In Production⚑ FAE-Confirmed P2P: AD7960πŸš€ 6-Week Standard Lead Time

SXA004 β€” 18-bit 5 MSPS ADC

SXA004 is mapped by Shenxin FAE as a pin-to-pin alternative to AD7960. Device-level specifications are shown from the current Shenxin technical source. Validate electrical, timing, software/register, and system-level compatibility for your application before production migration.

βœ“ In production now
βœ“ 6-week lead time
βœ“ Direct FAE support
βœ“ Engineering samples available
FAE-Confirmed P2P: AD7960

SXA004 is mapped by Shenxin FAE as a pin-to-pin alternative to AD7960. Device-level specifications are shown from the current Shenxin technical source. Validate electrical, timing, software/register, and system-level compatibility for your application before production migration.

Why Engineers Switch to SXA004

πŸ”„

FAE-Confirmed P2P Mapping

FAE mapping confirms SXA004 ↔ AD7960 as P2P. Validate application-specific electrical, timing, software/register, and system behavior before production migration.

⚑

6-Week Standard Lead Time

6-week standard lead time. Imported converter lead times vary by device, region, and channel. Keep your production schedule on track and avoid costly delays.

πŸ”§

Direct FAE Support

Get an assigned FAE engineer within 24 hours. Reference designs, driver porting, application notes, and debug support β€” all included.

Product Details

Current authoritative specification snapshot

  • Resolution: 18-bit
  • Channels: Single-channel
  • Sample/Conversion Rate: 5 MSPS
  • Interface: Serial LVDS
  • Package: QFN32
  • Power: 50 mW typ.
  • Key Performance / Functions: SNR 95 dB typ.; INL Β±1.5 LSB typ.
  • FAE-confirmed P2P mapping: AD7960

Fields not listed here are intentionally not inferred. Contact Shenxin FAE for the latest full datasheet and migration validation package.

πŸ“¨ Request Quote & Datasheet

Fill out the form below β€” our FAE team will respond within 24 hours with datasheet and pricing.

πŸ”’ By submitting, you agree that we may process your inquiry as described in our Privacy Policy.

Frequently Asked Questions

What does the P2P status for SXA004 mean?
SXA004 is mapped by Shenxin FAE as a pin-to-pin alternative to AD7960. Device-level specifications are shown from the current Shenxin technical source. Validate electrical, timing, software/register, and system-level compatibility for your application before production migration.
What is the lead time for SXA004?
Standard lead time is approximately 6 weeks for production quantities. Engineering samples may be available for evaluation β€” contact us for sample availability. Imported converter lead times vary by device, region, and channel β€” contact us to compare on your specific bill of materials.
Can I get engineering samples for evaluation?
Yes, we offer evaluation samples. Use the request form on this page and select "Sample Request" from the product dropdown. Our team will contact you within 24 hours to confirm availability and arrange shipment. Contact us to discuss evaluation requirements and confirm available options.
What technical support do you provide?
We provide direct FAE (Field Application Engineer) support, including: reference schematics, driver/software porting guidance, PCB layout review, and application engineering support. An assigned FAE responds within 24 business hours. For volume customers, we also offer custom technical support packages and on-site engineering assistance.
What about quality and reliability?
All SXA004 devices are manufactured in ISO-certified facilities and undergo full wafer sort and final test. Industrial temperature range is standard for most products. We can provide quality documentation, reliability test reports, and characterization data upon request under NDA.
Do you offer volume pricing and long-term supply?
Yes. For volume orders and production programs, we offer tiered pricing and long-term supply agreements with guaranteed availability. Contact our sales team with your estimated annual usage and we will provide a competitive quotation and supply commitment.
AD7960
FAE P2P Mapping
~6 weeks
Lead Time
FAE
Design Support

Need SXA004 Details?

Our FAE team can provide preliminary specifications, pin comparison reports, and sample evaluation support for the SXA004.

πŸ“§ Contact FAE Team
Request Quote See Specs